Nazza Wire opens application cards, inspection dates and license issue slips at the licensing window at Cinder Hall. Before anyone changes a mark, the crew checks a single inspector covers three wards during a rain shift. The smelt run period sets the pace of the work.
The page holds 86 applications issued or returned with a dated reason. Nazza Wire reads the preceding count, 84, before the next line is entered. A number without a date would not tell the next crew what changed.
The hall posts a total wait. Shopkeepers ask for inspection waits separate from paperwork waits. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.
The clerk attaches the contract copy and the crew’s original handoff card. The Year third, smelt run window 2 file remains open for its scheduled decision. The office will split its queue into record review and site inspection.
The shift closes with the source page attached to the board. The next file uses a new date and scope.