Narra Vale opens sealed cargo lists, weigh slips and the port transfer book at the cargo ramp at Ash Port. Before anyone changes a mark, the crew checks the ramp transfer is recorded before the market scale opens. The cooling weeks period sets the pace of the work.
The page holds 91 sacks matched from ship seal to market receipt. Narra Vale reads the preceding count, 90, before the next line is entered. A number without a date would not tell the next crew what changed.
The carrier counts the sealed load. The market counts what remains after the ramp transfer. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.
Anew work docket opens with a named machine, shift and measure. The Year fifth, cooling weeks window 1 file remains open for its scheduled decision. The port will test a shared seal number on the ramp and market slips.
The shift closes with the source page attached to the board. The next file uses a new date and scope.