The first file on the market gate queue began with queue tickets, gate opening marks and stall delivery receipts. The city then checked the source, heard affected residents and sent a second office to repeat the count.
The current Year second, smelt run window 1 file records 77 deliveries admitted before the first public bell; the previous window records 74. The longer sequence makes the change visible, while each count remains tied to its own dates.
A turning point was the observation that the freight lane is shared with a neighborhood water cart. It narrowed the discussion from a general claim to a question about how the rule works at the site.
Merchants want a dedicated lane. Residents say the water cart cannot wait until the market is stocked. The shared record is larger than it was at the start, although the parties still assign it different weight.
The committee records a decision and the reason on the public board. The board recorded the outcome that it adopted a revised schedule with a worker review period.