The Year fifth, rain shift window 2 review of the cooling water allocation reached a new step at the west cooling channel. The clerk attaches the contract copy and the crew’s original handoff card. The Year fifth, rain shift window 2 file remains open for its scheduled decision. The water office will add a downstream reading to each intake card.
Hessa Cinder, water allocation clerk, said the latest file records 69 draws with both a meter mark and a discharge note. The preceding window recorded 66; the figures cover entries on the register, not every condition at the site.
Foundry managers count intake volume. Downstream residents want the discharge temperature recorded too. At the latest public meeting, residents asked the clerk to keep their account beside the source count.
The cooling meter cards and the neighborhood draw schedule lists 69 draws with both a meter mark and a discharge note; the previous window lists 66. Nazza Wire checked both against public notices checked against the copies households actually received. The next measurement is assigned to a second office and will be published with its method.
The Year fifth, rain shift window 2 file remains open for its scheduled decision. The water office will add a downstream reading to each intake card.