Hessa Cinder opens cooling meter cards and the neighborhood draw schedule at the west cooling channel. Before anyone changes a mark, the crew checks the discharge channel warms after a long furnace run. The rain shift period sets the pace of the work.

The page holds 38 draws with both a meter mark and a discharge note. Hessa Cinder reads the preceding count, 37, before the next line is entered. A number without a date would not tell the next crew what changed.

Foundry managers count intake volume. Downstream residents want the discharge temperature recorded too. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.

Atime-limited trial begins under a dated card visible to the crew. The Year fourth, rain shift window 3 file remains open for its scheduled decision. The water office will add a downstream reading to each intake card.

The shift closes with the source page attached to the board. The next file uses a new date and scope.