Vek Cinder opens intake meters, tower temperature cards and shift requests at the shared cooling tower at Copper Loop. Before anyone changes a mark, the crew checks two workshops share the same tower during the hottest part of the smelt run. The smelt run period sets the pace of the work.
The page holds 89 water turns with an intake and return temperature. Vek Cinder reads the preceding count, 95, before the next line is entered. A number without a date would not tell the next crew what changed.
Each shop counts its own intake. The common board does not show the return temperature at the tower. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.
Atime-limited trial begins under a dated card visible to the crew. The Year third, smelt run window 2 file remains open for its scheduled decision. Operators will post paired intake and return readings during the shared turn.
The shift closes with the source page attached to the board. The next file uses a new date and scope.