STATUS: Anew work docket opens with a named machine, shift and measure. The current arrangement remains in place at the bridge over Dry Channel.

RECORD: load cards, repair invoices and the closure board. The count is 38 heavy crossings during the repair limit; the prior window recorded 44.

DISPUTE: Carriers favor a supervised crossing. Masons say the second lane changes vibration on the support.

OUTCOME: The hearing is still open and no permanent rule has changed.

NEXT: The Year fifth, smelt run window 2 file remains open for its scheduled decision. The bridge crew will compare readings with the lane closed and under one supervised load.