STATUS: Anew work docket opens with a named machine, shift and measure. The current arrangement remains in place at the bridge over Dry Channel.
RECORD: load cards, repair invoices and the closure board. The count is 23 heavy crossings during the repair limit; the prior window recorded 24.
DISPUTE: Carriers favor a supervised crossing. Masons say the second lane changes vibration on the support.
OUTCOME: The hearing is still open and no permanent rule has changed.
NEXT: The Year first, rain shift window 3 file remains open for its scheduled decision. The bridge crew will compare readings with the lane closed and under one supervised load.